a very busy day today !!!!!
me and digby woke up at 9am, and cut out the remaining bulkheads, phil and sarah then arrived at 1030am, a mention must be given here to oscar the guinea pig who was an incredibly usefull aid to navigation to our often hard to find house, with Sarah's help of course!!!
the next 10 hours followed in a whirlwind of work...
by the end of day 1 we have:
1/ 75% fitted hull, deck and bulkheads (alot of sanding)
2/ made a mast stump from an old piece os Rs 800 mast (yet more sanding tho remove the track)
3/ laminated up some 2mm carbon plate for various uses (very strong)
4/ vac-bagged the tension struts (very clever mould - thanks phil)
5/ laminated both the forward and rear rack beams (some very good use of old drainpipe as mandrels)
6/ made a centre board casing
7/ phil jigsawed through the hull shell, accurately thankfully (sounded like it was going to break)
8/ learnt a huge deal
8/ destroyed at least 4 pairs of scissors
altogether, a very productive days work, pictures to follow
