The Squid will be having quite a lot of work this winter, hopefully......
Going to try get the keys to work and use the full height factory, enough room to have the rig up
1st up, stumping and a new mast. New mast needs a 2nd set of spreaders and some rigging, but I do have the mast and stump ready.
2nd is fix up my dagger board slot that seems to have punctured the crash box and make her water tight.
3rd is beef up the jib track and backing to take the loads of the larger jib.
4th is hopefully source a t-foil system and fit that.
After that, probably some cosmetic bits and bobs and possibly wheelie bars as I think Squid might be in serious need going down hill in any breeze.
If anyone has any advice for any of the above please do throw it my way.
Cheers